Default Re: Workshop lining

The Peltier dehumidifier is on a timeswitch already - however, with having insulated the inside of the door in such a way as to minimise draught gaps as well as "through-loss', I've found the amount of condensate produced is now very small - less than 20ml over a two-day period, with it operating between 00:05 - 07:25, as previously mentioned. The convector heater is powered via the same time-switch but its feed is in series with a thermostatically-controlled relay (B&Q unit) that is set to 19C (auto) overnight and 21C (manual) whenever I'm actually in there.