View Single Post
Old 7th Mar 2018, 8:12 pm   #36
paulsherwin
Moderator
 
paulsherwin's Avatar
 
Join Date: Jun 2003
Location: Oxford, UK
Posts: 27,970
Default Re: Electric clocks running slow warning

There were certainly some odd things happening during the Beast. I noticed that significant generation was by OCGT, which is normally considered an emergency source given the cost per unit. The total UK demand wasn't especially high for a winter day. This might be explained by the French and/or Dutch suddenly suspending supplies via the interconnectors, and indeed calling on the UK to supply emergency power. I can't remember the status of the various interconnectors at the time though.
paulsherwin is online now