View Single Post
Old 26th Aug 2017, 11:34 pm   #41
FERNSEH
Dekatron
 
FERNSEH's Avatar
 
Join Date: Mar 2005
Location: Gateshead, Tyne and Wear, UK.
Posts: 7,444
Default Re: And the next one! a GEC BT2147

The circuit diagram of the frame timebase. The sawtooth waveform is developed across C50 and is negative going so a leak in C52 would tend to over bias V17.
The frame linearity feed back capacitor should be checked or replaced. It is marked as C57 in the circuit diagram shown in post #36 and as C58 in the official GEC BT2147 and BT5144 circuit diagram.
DFWB.
Attached Thumbnails
Click image for larger version

Name:	GECBT5144_18.jpg
Views:	149
Size:	62.3 KB
ID:	148480  

Last edited by FERNSEH; 26th Aug 2017 at 11:42 pm.
FERNSEH is offline